Thursday, March 18, 2010

A deluge of pictures...

(Brendan)

Okay, these aren't the best pictures I've ever taken, it seems like whenever I get to the house it's sunset time and dark soon thereafter. Nonetheless, these should give you an indication of where we are at (as of Monday).

(Click any to enlarge)

First, some pics of the home exterior (snow just recently melted, and it's a little messy out there). The siding is gray only because it is pre-primed and will now need to be painted white.





An example of our exterior light fixtures:


Now to the inside. Here's a few pics of the kitchen:


You can see the IKEA cabinets are looking great, and also spot the mini pendants we chose for above the island, with amber shades.


Here's a shot of our kitchen faucet (reference this old post):


And a better shot of the awesome double farmhouse sink:


Our countertops are a simple laminate from IKEA with a solid gray color ($5 per square foot):


Here are our light fixtures in the mudroom and storage room (fitting with most every other light fixture and plumbing fixture in the house: simple, cheap, cool):


I would say the dining room fixture was one of our splurge items (simple, not-so-cheap, cool), and it's hard to see in this picture but it looks exactly like we hoped:


The foyer and family room lights go together. This is the foyer light, which is a ceiling mount version of the family room pendant lights (which you'll see in a few more pics):


Here's a closer shot of our doors, which are another case in getting the most for your money. Since we went with white painted trim as our design strategy throughout the house, this meant that all the trim and doors could be medium density fiberboard (MDF) instead of solid wood (after all, who cares, they're going to be painted white). But at the same time, the doors are solid MDF, and they are HEAVY. I can barely lift one of them. When you open or close them you can feel how substantial they are, which gives a high quality vibe. And their cost is probably 40% less than if they were solid stained wood. All doors and trim are pre-primed and will need to be enamel painted (white) once we move in:


The door on the left is the first floor bathroom, and the right is the foyer closet. Also note above that no detail was overlooked. All of our light fixtures, plumbing fixtures, and door hardware are a brushed nickel finish (or similar), and you can see that carried through right down to the door hinges. This happens when you are cursed with perfectionism (and your wife is too), and every once in a while it comes in useful.

The first floor bathroom vanity and sink, also from IKEA, which I recently constructed:


Also note, no custom or built in cabinetry is anywhere in the home. Only well-designed, cool, and much cheaper cabinets. The faucet is from Hudson-Reed, which has ridiculously awesome plumbing fixtures for ridiculously low prices.

The vanity light in the first floor bathroom:


On to the school room, which has a very exciting light fixture that I found at Schoolhouse Electric (based in Oregon). It's an authentically made period "schoolhouse" light, with hand-blown and hand-painted glass. Lights like these adorned schoolhouses and homes in the early 20th century, and we had to get one as a special touch for our school room. Super-high quality and great craftsmanship, and I love supporting small companies like Schoolhouse Electric.



Here's the family room, which has the pendant lights I was referring to earlier that match the ceiling light in the foyer.


The finishing of the fireplace is just being worked on now. I must say, every once in a while you take a risk (like I did with my crazy concrete backer board finishing decision) and it totally, completely works out!. I was starting to have my doubts, but seeing the finished product on the library side really made me glad I took the risk. Again, concrete backer board is totally not meant for this purpose, it's an underlayment for tile. It's got writing all over it and the contractor had to cut special pieces and sizes just to avoid the writing. But in the end, it looks even better than I thought it would.



I still plan on at least sealing it with concrete sealer (to avoid a permanent stain left by one of our little gremlins), but am unsure whether I'll actually end up staining it with concrete stain. I like the basic color as it is. The fireplace wall still needs to be painted as well, we were waiting to see how the fireplace surround would look.

One the last things I need to finish, the wood floor on the stairs. I've got a start on the bottom few stairs.


Our wall sconces in the upstairs hallways:



The laundry room floor, which has the stock slate tile we found at Home Depot (a silly low $1.69 per square foot). A tip: anything that is a "stock" item at Home Depot will be cheaper than anywhere else by far. If you have to order something from Home Depot that will need to be delivered to the store (i.e. not a stock item) then it's just as expensive as any specialty store. Stick to stock items and you'll save a ton. And this slate looks incredible (the main use for it is in the master bathroom, while you'll see in a few moments).


The boys' room carpet design which we put together using 6 different carpet tiles from Flor. It resembles a quilt, we think.


The strategy in the boys' room was to have the floor be a little wild and the wall something neutral:


The boys' bathroom, which has gray walls and black and white ceramic floor tiles, and a sink from IKEA.



A pic of the carpet tile design in the girls' room:


And of course, the walls must be pink! It's more noticeable at night, and a very light pink in the daytime. Also in the pic below, the girls' vanities that I constructed and are awaiting install after their tile backsplash is done.


Here's the floor tile in the girls' bathroom:


A pic of the light fixture in the nursery:


And now on to what will end up clearly being one of the crown jewels of the house, the master bathroom. Here you can see the slate tile floor:


And here's a first look at the upgraded shower. We were going to have the same drop-in shower as the boys' bathroom, but not only did we decide it would be worth the money to have a tile shower (where we could use the same slate tile as the floor), it turned out the boys' shower would not have fit in this tight corner. We needed a custom rectangular shape to make the shower work in this space, so all in all it was a good decision. FYI, the glass surround/door still needs to be installed.



And now Molly's favorite, her only request for the house, a nice deep bathtub with water jets.



The cool tub faucet is from Hudson-Reed, as are the shower head and valve, and these cool sink faucets (just awaiting delivery of the vanity and sinks!):


And finally, just a couple close-ups of the baseboards and window trim we went with. Trim cleans up the look of everything so nicely.



Ah... done. That should be enough to digest for a while. Blessings to you as we approach Easter!

St. Joseph (feast day this Friday!), patron of the home and of the family, we ask your prayers for the successful completion of our home and a smooth move on March 27th.

(FYI, it would be imprudent to observe your lenten fast this Friday; the feast of St. Joseph is a solemnity after all!).

Sunday, March 14, 2010

Say hello to Francis!

(Brendan)

Molly had her 20-week ultrasound last Wednesday, and we were both pretty nervous going into it. Molly and I met at the radiologist's office and confided to each other how nervous we were, given past events with Henry (full-term still birth) and Jude (miscarriage). There wasn't necessarily any reason to be nervous; everything with this pregnancy has gone well. And though we have given our newest soul over to God many times over, and always work to conform our will to the Lord's, the mind tends to remember the trauma of past ultrasounds. There was the finding of the heartbeat to worry about, and if we could get past that, then the measuring and determination of any developmental difficulties, not to mention worries about whether we'd have to go through the agony of having the ultrasound tech conduct everything in silence and not tell us what was going on (which frequently occurs with ultrasounds, some feeling it's better to say nothing and let the doctor tell us the results later). But, there were things to look forward to as well; one being the fact that, for the first time, we both decided to find out the gender of the baby at the ultrasound.

God truly blessed us at this ultrasound; our tech was extremely helpful and very caring. Hearing our background, especially with Henry, made her very sensitive to what would help us through this ultrasound, and she was very open with what she was doing and seeing. First, a strong heartbeat found (exhale). Then, almost right away, the clear indication of the gender: it's a boy! 

Francis Simon Koop!

PRAISE GOD, Francis is a perfectly normal, healthy, twenty-week old baby boy in his mother's womb. After ultrasound measurements, his due date is only two days earlier than previously projected: July 26. Say hello to Francis!

Francis' little feet

Francis yawning

Francis sucking his thumb :-)

A glimpse of Francis' face

Your continued prayers are so very much appreciated, and thanks for all of your prayers thus far!

Summary of recent events at the house...

(Brendan)

Ugh, it seems like every post I do I have to apologize for the lack of posting, and I'm feeling especially bad about the lack of pictures. I'm still doing things at the house on some weekday evenings (thanks to my heroic wife and my heroic babysitting Mom!) and most weekend days, and the busyness prevents me from being able to post. But even then it seems like I forget to bring the camera every time, and then, like today, even when I bring the camera I go to take a picture and the battery is dead! Anyway, I digress. In case you are wondering, here's a synopsis of the current state of things at the house:
  • I've finished all the remaining interior painting except for a few touch up areas and the fireplace wall
  • The IKEA kitchen is 90% installed
  • Probably 80% of all the light fixtures are installed (the rest will probably be done tomorrow or Tuesday)
  • I assembled the first floor bathroom vanity and sink, and the girls' vanities and sinks
  • All the interior doors have been installed
  • Roughly 90% of the trim (baseboards, door trim, window trim, etc.) is installed -- I'll do the finish enamel painting after we move in
  • Molly installed the girls' room and master bedroom carpet tiles, and with some helpers installed the boys' room carpet tiles -- only part of the nursery and the master wardrobe are left
  • All the floor tile in the laundry room, girls' bathroom, boys' bathroom, and master bathroom has been installed, including a tile shower in the master bathroom that we're very excited about! -- only the tile backsplashes left in the girls' bathroom and kitchen
  • All exterior siding has been installed -- I will do the exterior painting after we move in
  • The cement board finishing of the fireplace is done on the library side, with the rest to be done tomorrow (and looks fantastic!)
I'm going out to the house again tomorrow night (I'm working on finishing the wood floor on the stairs) and I will be bringing the camera and the battery is charging right now. So, pictures will be posted post haste!

Tuesday, March 2, 2010

Online magazine article about our home!

(Brendan)

I was recently interviewed by Claire Trageser of SprayFoam Magazine, who contacted me after seeing our blog, for an online magazine article. Working with Claire was a pleasure, and she did an incredible job on the finished article. Please take a read and enjoy!

Hot Roof in the Icy Cold: A Residential SPF Project During a Minnesota Winter

Friday, February 26, 2010

Exhausted... but closing in on success

(Brendan)

Tonight has been my first night not working at the house in a long time, and thus I finally have a few minutes to post some pictures. For those ever planning on building a house in the future, I do recommend doing some work yourself; you make a connection with the construction of your house that you simply cannot have when you just walk in to a finished home that was 100% done by others. It's great to see wood floor that you laid, or walls that you painted, even little mistakes that you made that will always be part of the house. That said, I (not surprisingly) do not recommend doing the amount of work that I (with lots of help from others!) am doing. I wouldn't have chosen to do this much work; this was something that ultimately needed to be done to make the numbers work for our home loan. But, after 14 straight days of 14-hour days, I think we're within striking distance of getting everything done that needed to get done by Sunday. Thanks a million to all of those who have helped during this time, we could not have done it without you! You are all a great blessing to our family!

(Click on any picture to enlarge)

My good friend Greg, and fellow member of the men's group I am a part of, priming the storage room.

My brother Evan and my aunt Mary doing some priming.

My friend and co-worker Rob, roller in hand.

My Dad after a long day of priming.

This ridiculous composite picture was taken by my sister, Allison, when I was priming the ceiling of the chasm that is our staircase. I got the longest pole I could get at Home Depot for just this occasion.

Allison, after another long day.

Here are some boards for the wood floor we selected from Lumber Liquidators. It has a distressed finish, which will mask the scratches that inevitably will happen from the kids.

A picture of the underlayment that I laid down before laying the wood floor on top (an arrangement called a "floating" wood floor, to allow it to expand and contract as the radiant heat in the concrete slab below turns on and off).

The wood floor being installed in the school room.

The floor being installed down one of the lower floor hallways.

My friend Joe, who graciously helped with the wood floor installation the first two days and lent me all of his saws to use during the installation. Thanks Joe (and Jenny)!

A first look at the painted color in the kitchen -- Tranquil Aqua from Sherwin Williams.

The palette of colors viewed together from the family room, looking down to the kitchen.

A view from the other side hallway.

I don't have pictures of everyone who helped unfortunately. My cousin Katherine has come over multiple days to paint and been a huge help, I'll have to get a picture next time!

By the way, the in-floor radiant heat is incredible! It's a completely even heat, everywhere, with no cold areas or drafty areas, and our structural insulated panel home is so well insulated and so efficient that during one 48-hour period (of roughly 10-20 deg F temperatures) I heard the radiant heat turn on one time... ONCE. It's truly amazing; the most comfortable temperature-controlled environment possible.

Lots more pictures to come, at some point!

Thursday, February 18, 2010

A good way to start off Lent...

(Brendan)

A blessed and prayerful Lent to everyone, sorry for the lack of updates on the house; I've been, shall we say, busy. I am in the middle of the first of two weeks of "vacation" from my day job in order to work on the house. So far, with the help of many family and friends, the whole interior of the house (ceilings and walls) was primed last Saturday, Sunday, and Monday. Tuesday was spent hauling the wood flooring from storage to the house so that it can acclimate for 72 hours before starting the install this Friday. Today was spent painting the ceiling and walls of the family room and library, and tomorrow will be doing the same in the rest of the first level. 

Suffice it to say, I am sore and tired, but it's a good kind of sore and tired :-)  As far as I can tell, everything that needs to get done is on track to get done within the two weeks that I have. The labor that I (with help) am providing in order to save on cost is:
  • Interior priming (ceilings and walls)
  • Interior painting (ceilings and walls)
  • Wood flooring installation (first level, stairs, and second level hallways)
  • Carpet installation in all second floor bedrooms
  • Pick-up, storage, and delivery of all kitchen cabinetry/appliances/counters 
  • Assembly of all bathroom vanities/cabinets
  • Interior enameling (all trim, interior doors, and exterior doors) 
  • Installation of all light fixtures 
  • Staining of fireplace cement board
  • All exterior painting (likely late April/early May, after we move in -- warmer weather is required)
The first five are what I hope to get done in these two weeks. Compared to my PhD, this is still a cakewalk (it's always good to have a "somehow I made it through that, so I guess this will work out okay" comparison situation to buoy one's spirits). I'll try to post some pictures of the priming/painting soon! Thanks to all of those who have helped thus far!

**A note from Molly:  Brendan has been working diligently these past several days and our entire family is grateful for the time he is putting in!  Especially considering the money this saves us!  In terms of Lenten sacrifice, apparently the Lord saw fit that a fall I took on a quick jaunt up the stairs would result in a spiral fracture to my dominant hand.  I suppose if it had to happen, it couldn't have happened under better circumstances--living with an orthopedic surgeon and all, not to mention a Nana willing to change diapers.  So, while Brendan is working on the new house night and day, the kids are learning all kinds of helpful tasks like stripping and remaking beds, rolling socks, and grilling cheese sandwiches.  Lenten blessings everyone!

Thursday, February 11, 2010

Twitter for unborn babies

(Brendan)


Though I think, after a while, little unborn child may have to have their Twitter account deactivated due to too many tweets.

Monday, February 8, 2010

Why big families might be easier...

(Brendan)

I've got to get back to posting some non-construction content on this blog, so in that spirit, I wholeheartedly agree with this very humorous article:


I think this doubly applies for any large homeschooling families out there!