I dropped in on the construction site again today over my lunch hour, here's a few cell phone pics...
The backfill within the frost footing walls is nearly complete, and some exterior grading still remains to be done. These next two pics show what the outside view will look like beyond the wall of windows (the wall opposite the side I'm standing) in the family room/library.
The next pic is looking toward the front of the garage; the digger in the background was being used at the time to complete the backfill in the kitchen.
Our general contractor had a new sign put up, which I like because it advertises lots of the high performance features of their preferred method of construction (structural insulated panels, high-performance HVAC systems, green-friendly construction practices, etc.).
I dropped in on the construction site again today over my lunch hour, here's a few cell phone pics...
The backfill within the frost footing walls is nearly complete, and some exterior grading still remains to be done. These next two pics show what the outside view will look like beyond the wall of windows (the wall opposite the side I'm standing) in the family room/library.
The next pic is looking toward the front of the garage; the digger in the background was being used at the time to complete the backfill in the kitchen.
Our general contractor had a new sign put up, which I like because it advertises lots of the high performance features of their preferred method of construction (structural insulated panels, high-performance HVAC systems, green-friendly construction practices, etc.).