(Brendan)

Sorry for the lack of updates lately, for a while the "scene" pretty much looked the same as my last picture update. The septic system has been installed and inspected, plumbing lines to and from the house have been installed, floor outlets were installed, and gas lines were put in place. All of that had to happen in order for the floor insulation to be laid down and the hydronic radiant heat tubing to be installed.

Radiant heat tubing was one of things that I decided to do in order to save money, and this past weekend was free and the construction crew was able to get everything in ready for me and my brother Evan to work on Saturday. Molly even helped finish it off on Sunday!